Rephrase each and every sentence of the following, make them sound Environmentalic: Waste generated on site must be removed on a regular basis, as determined by the EO. This frequency may change during construction depending on waste volumes generated
- The waste produced at the construction site should be cleared consistently, in accordance with the Environmental Officer's recommendations. The removal frequency may be adjusted throughout the construction phases, depending on the varying quantities of waste generated at each stage.
- Waste removal should be carried out by a qualified contractor who adheres to environmental standards, ensuring disposal at a licensed landfill. The contractor is required to provide documentation confirming the proper disposal of waste.