Le Contractant doit vérifier les certificats de réception matière de tout le matériel (composants, tés, coudes, tubes, etc.). En particulier pour les certificats type 3.1 ou 3.2 selon l’EN 10204, le Contractant se doit de prendre connaissance des état
The Contractor must verify the material receipt certificates for all equipment (components, tees, elbows, pipes, etc.). In particular, for certificates type 3.1 or 3.2 according to EN 10204, the Contractor is required to understand the metallurgical delivery states of the materials (normalized, quenched and tempered, etc.) for the proper preparation of welding records.
The Contractor must verify the manufacturer’s documentation for the piping accessories (valves, check valves, etc.), which are individually subjected to the PED (Pressure Equipment Directive). In particular, the presence of instruction manuals and the conformity declarations for the PED and ATEX (if applicable) must be verified.