Rephrase each and every sentence of the following, make them sound Environmentalic: It is expected that the operational phase will result in the production of general waste consisting mostly of cardboard, paper, plastic, tins, metals and a variety of syn
During the operational phase, we anticipate the generation of general waste characterized primarily by cardboard, paper, plastics, metals, tins, and a spectrum of synthetic substances. Additionally, modest amounts of hazardous waste, such as oils and greases, may result from maintenance activities. To promote responsible waste management, all waste produced will need to be temporarily housed on-site in secure, sealed containers before being transported to a designated environmentally-approved landfill.
The following eco-conscious waste management principles will guide our actions during the operational phase:
- The Environmental and Site Manager is responsible for establishing, executing, and upholding a comprehensive waste inventory that documents all waste types produced, covering both general and hazardous streams.
- Sufficient waste collection bins will be provided on-site, with designated containers for general waste and hazardous materials to encourage proper sorting.
- Materials that can be recycled must be extracted from the general waste stream and stored separately to maximize resource recovery.
- All waste must be held in suitable temporary storage containers, distinctly categorized by operational type and contamination level (e.g., wet waste), at each area of operation, before being transferred to the waste storage zone for further sorting, if necessary. Waste storage will adhere to best-practice environmental guidelines, and incineration of waste on-site is strictly prohibited.
- Any vegetation cleared from the site should be chipped and either removed for disposal at a responsible facility or repurposed as mulch for use on-site.
- Waste generated on-site must be regularly cleared to maintain a clean and healthy environment throughout the operational phase.
- Proper disposal of waste will be conducted by a licensed contractor with appropriate qualifications, ensuring that all materials are taken to a suitably licensed landfill site, accompanied by certified proof of disposal.